Fabrication

With the assistance of my buddy Mark, a student at Weber State we machined all the materials seen in the “ACP” bay with the exception of the box mounted diagonally at the top during the summer of 1999. The other bays all have parts that my assistant or I machined on a manual end mill or lathe. 
We were then responsible for inspection of our parts to ensure that they met spec for drawings that I produced for the design phase of the project and then for integration in our clean room.
 

 

 

 

 

 

Fabrication